Hello Vercel team,
I will move to Pro before commercial testing. Before running any automated hosted capacity test, I would like to clarify the boundary between ordinary workflow acceptance testing and load testing.
The intended scope is a protected Preview, synthetic data and normal authenticated application workflows, with at most 18 concurrent test sessions. The exact duration, request-rate/total-request bounds and stop conditions would be finalized before any test; no hosted capacity test has been run under this proposal or permission assumed.
Your load-testing policy says load testing is limited to Enterprise or discussion with the responsible sales manager: https://vercel.com/kb/guide/what-s-vercel-s-policy-regarding-load-testing-deployments
The practical testing guide also describes realistic application scenarios and an engineering-ticket threshold of 50,000 requests/second: https://vercel.com/kb/guide/how-to-effectively-load-test-your-vercel-application
Could Vercel staff clarify:
- Does the small fixed-concurrency workflow test described above require advance load-test authorization, and can it be approved on Pro?
- Which team/channel should a non-Enterprise customer contact, and which exact test parameters must be submitted?
- Does the 50,000-RPS threshold concern additional engineering coordination rather than general permission to test below it?
This is a policy/process question, not a request to execute a test or change an account. I can provide an exact bounded plan through an appropriate private channel if required. Thank you.