Hello Vercel team,
My Hobby team (zivlazars-projects) was paused on 22 November 2026 for Fluid Active CPU. The usage page shows 4h 32s against the 4h limit, so the overage is 32 seconds. Every other metric is well within Hobby limits, most below 50%.
The Vercel Agent told me the team has already used its one-time grace period, so it could not lift the pause. It also said it could not verify the usage figures because billing data was unavailable.
I will review which functions used the CPU and reduce it, so usage stays under the limit.
Given how small the overage is, could a member of staff review the team and consider lifting the pause? If that is not possible, I would appreciate confirmation so I can plan next steps.
Thank you, Ziv