Hi everyone,
I briefly enabled Vercel CI to try it out and exceeded the Hobby CI quota. I didn’t realize that going over the limit could take every site on the team offline, including projects that weren’t part of the test.
As soon as I noticed the outage, I upgraded to Pro to bring my sites back online. I then moved CI back to GitHub Actions and disabled Vercel CI on all connected repositories. When I tried to return to Hobby, my sites went offline again.
The Vercel support assistant suggested that my previous CI usage still counts in a rolling 30-day window, but it couldn’t confirm when it would be safe to downgrade.
Has anyone run into this? Is there a way to check whether my previous CI usage has dropped below the Hobby limit before I downgrade again? Is waiting for that usage to drop out of the window the only option?
Thanks for any guidance!