Hey team quick feedback on v0 UX.
I ran into something confusing today.
There was an error coming from a v0-generated feature and the button said “Fix with v0 Free”, so I clicked it expecting no credits to be used.
But as soon as the fix ran, my credits were deducted with no warning.
I get that agent runs cost credits, but then calling the button “Free to fix” is really misleading. At best the analysis is free, not the fix itself.
It would really help if:
-
the button said something like “Analyze error (free)”, or
-
there was a clear warning that applying the fix will use credits
Especially when the issue comes from v0 itself, this feels rough.
Sharing this so others don’t get surprised the same way