Why Vercel Hobby Plan shows 0s build minutes available after low usage

Problem

I need help understanding the Vercel Hobby Plan Build Minutes. My dashboard says Build Minutes has “Exceeded Free Resources”, but the plan details state it includes 6000 minutes.

Current Behavior

  • Usage History: Only 26 build minutes consumed in the last 12 months.
  • Settings: On-Demand Concurrent Builds is set to Disabled and Build Machines is set to Standard.
  • Status: The overview shows 26m/0s available.

Status: Exceeded Free Resources

Have I set something by mistake that’s causing this?